Zuchwil – Successful trial run and handover to Kenova

April 22, 2026

Following a failure-free and stable plant operation over an extended period of 3 months, we are pleased to announce the signature of the Preliminary Acceptance Certificate (PAC) of the Flue Gas Treatment of for the Waste-to-Energy plant.

  • Project KEBAG Enova Emmenspitz Waste-to-Energy plant – Zuchwil, Canton of Solothurn, Switzerland
  • 2 lines – 16.5 t/h each (≈ 220,000 tons/year of municipal & industrial waste)

    This milestone marks the transition to operation under kenova’s full responsibility.

    Project highlights

    • High-efficiency combined Flue Gas Treatment system (wet + dry)
    • Stable and reliable operation under real conditions
    • Integrated heat recovery
    • Operation with very low emission levels

The PAC has been granted, with final performances validation currently under evaluation.
At LAB, this phase is key: it demonstrates our ability to deliver robust and field-proven solutions, ensuring a smooth transition from commissioning to operation.

Thanks to all LAB involved employees on the project and to KENOVA and TBF for the excellent collaboration during all phases of the project.

Next steps

• Finalisation of as-built documentation
• Closure of remaining points
• First maintenance revision on Line 1